Construction estimating

A construction estimate turns drawings and specifications into measured quantities and costs. How detailed it can be depends on how far the design has progressed — this page explains the common estimate types, the standards used in each market, and how a request works with us.

Estimate types by design stage

Estimates are usually classified by how much of the project is defined. In the US and Canada this is often described using AACE International's estimate classes; in the UK, RICS New Rules of Measurement (NRM 1) sets out order-of-cost estimates and cost plans by stage.

Estimate types and the information each requires
Estimate typeTypical usePrepared fromResult
Conceptual or order-of-magnitudeFeasibility, site selection, early budgetsProgram, gross area, building type, locationA cost range built from area-based or system-level pricing, with the assumptions written down.
Preliminary or budgetSchematic design or design developmentPartial drawings, outline specificationElement or system-level quantities with allowances for undeveloped scope.
Detailed or bidConstruction documents, tendering, bid dayComplete drawings, specifications, addendaLine-item quantities and pricing by trade, CSI division or NRM element.
Trade takeoffSubcontractor or supplier biddingThe drawings and specification sections for one tradeQuantities for your scope only, in the units you price in.

Formats and units by market

United States
Detailed estimates are commonly organised by CSI MasterFormat division and measured in imperial units: cubic yards, square feet, linear feet, board feet and tons.
Canada
MasterFormat is also widely used. Drawings may be imperial or metric depending on the project, so we confirm the unit system before measuring.
United Kingdom
Measurement typically follows RICS NRM: NRM 1 for cost planning and NRM 2 for detailed measurement for building works. Quantities are metric: m³, m², m and tonnes.

If you need a particular template or breakdown — for example matching an owner's bid form or your own estimating spreadsheet — tell us in the request.

What affects the price of an estimate

  • Size and complexity of the building
  • Number of trades or divisions to be priced
  • How complete and consistent the drawings are
  • Whether you need quantities only, or quantities with pricing
  • The deadline

We quote each estimate individually after reviewing the documents. There is no fixed price list.

How a request works

  1. Step 1

    Send the request

    Use the estimate request form to tell us the project type, location, trades and deadline.

  2. Step 2

    Review and quote

    We look at the documents, ask about anything unclear, and confirm the scope, format, price and delivery date of the estimate before work starts.

  3. Step 3

    Takeoff and pricing

    Quantities are measured from the drawings and priced for the project location. Assumptions, exclusions and the pricing basis are written into the estimate.

  4. Step 4

    Delivery and questions

    You receive the estimate in the agreed format. Questions and revisions are handled as agreed in the quote.

Estimates by trade and project type

Have drawings ready?

Send the plans, specifications and the scope you need priced. We review the documents and reply with any questions and a quote for the estimate.